movael

See the change. Understand the whole story.

Change intelligence

Connect the records. See the change.

The problem

The first note
is not the story.

Weeks of records.
One late note.

Logged late. The history is already weeks old.

How it works In development

Records in.
The whole story out.

Evidence first.
Human judgement always.

  1. Connect the evidence.

    Every file, tied to one event.

  2. Reconstruct the event.

    In date order, from the first sign.

  3. Make uncertainty visible.

    Recorded, assumed, or still open.

The product Concept

Every change
has a history.

Select a record.
See where it fits.

Riverside Works Level 02 steelwork design change

Human review required

Sources

Drawing revision · 4 June

The first indication.

“Beam depth at Level 02, grid C4 increased. Refer to revised connection detail.”

Records the design revision. It does not establish when the commercial team became aware of it.

Drawing STR-204, revision P03

Illustrative excerpt · Not an actual project record

Who it’s for

Built for the people
who make the call.

  • Commercial teams

    Quantity surveyors and commercial managers

    The evidence, before the review.

  • Project managers

    Project and package managers

    One issue. Every package.

  • Contractors

    Main and specialist contractors

    What changed, and when.

Get involved

Build it with us.

Built with the people who make the call.

Already using the earlier product?

Sign in to the existing notice workflow